Enhar Projects
Please refer below for our recent projects
Solar PVUniversitiesEmbedded NetworksEnergy StorageFeasibility StudiesEnergy AuditsDeveloping CountriesSchoolsNew South WalesGrant ApprovalsWind PowerSmall Wind Energy
Solar PV
Melbourne University - 100kW

100kW solar PV system Melbourne University – feasibility assessment, tender documentation, evaluation The project comprised of scoping, detailed feasibility assessment, load profile analysis and tender documentation for a large solar PV
City of Melbourne

Stage 1: Solar Energy Feasibility Multiple Council Facilities. Stage 2: Tender specification, tender evaluation and project management of 65kW of solar over 5 facilities. The project comprised a high level site screening of all council own
City of Moreland

Micro Generation feasibility and tender specification and evaluation at Multiple Council Facilities The project comprised a feasibility assessment and tender documentation for micro generation opportunities, at 14 council operated facilities.&
City of Frankston - PV/Hot water

Two projects have been completed for the City of Frankston between 2012 and 2014. The first project was a detailed feasibility assessment and tender documentation for solar PV and solar/efficient hot water systems at over 30 council owned faci
Wannon Water

Enhar were commissioned by Wannon Water to conduct a small renewable energy study for 66 Wannon Water owned and operated sites. The study was restricted to solar PV and small wind turbines under 100kW capacity. The feasibility assessments incl
Phillip Morris International

Enhar were commissioned by Phillip Morris International (PMI) to conduct a detailed feasibility assessment for solar PV power systems. The manufacturing site consists of a series of large roof spaces with multiple roof orientations and electrical
Universities
Latrobe University Solar PV project management

This project comprises high level scoping, detailed feasibility, design and tender documentation for solar PV installation across several University Campuses throughout Victoria. Enhar involvement is from project inceptions through to commis
University of Melbourne

The project has implemented over 1.5MW of solar PV. It involves scoping and optimum site identification, detailed feasibility assessments and concept design, request for tender documentation, evaluation of tenders, project superintendent and proje
Embedded Networks
Embedded Network Feasibility for the City of Greater Bendigo

The City of Greater Bendigo’s largest energy using buildings are in one precinct on View St and Barnard St in central Bendigo. The Council wishes to improve the environmental and economic performance of the energy supply at these sites by co
Energy Storage
Canadian Solar Energy Storage product optimisation

Canadian Solar engaged Enhar to undertake analysis of the Australian market for solar PV with Energy Storage Systems (ESS). Our approach was to identify the 'sweet spot' of battery capacity which provides the maximum return on invest
Energy Storage with Solar PV project design

Enhar was commissioned by Nillumbik Shire Council to investigate feasibility of solar PV with battery storage at a number of Council owned facilities. Our feasibiltiy design work included energy modelling and financial payback estimates, enabl
Feasibility Studies
Zero Net Energy Town - Uralla

The overall purpose of Zero Net Energy Town (ZNET) is to create Australia’s first town which satisfies all of its own energy needs from renewable energy sources in a way which is competitive with its current system of energy (in
Mallacoota Renewable Energy Feasibility Study

Client: Mallacoota Sustainable Energy Working Group including East Gippsland Shire Council, Ausnet Services The project comprised a feasibility study into renewable energy and energy storage options for the remote Victorian town of Mallacoota.
Melbourne Water

The project comprised of an assessment of various scale renewable energy options for the Eastern Treatment Plant, Victoria. Included in the renewable energy options assessed were small scale wind turbines, 500W wind turbines, rooftop mounted solar
Energy Audits
SKM Industries

SKM is a major recycling business in northern Melbourne, processing recylable waste from a huge portion of Melbourne. The facility includes state of the art screening and sorting equipment, processing mixed recyclable waste into products inc
Woods Furniture

Woods manufacture school furniture and their manufacturing facility has an annual power bill of approximately $100k. Enhar was commissioned by Woods to assist prepare a Clean Technology Grant Application for the plant to install a new energy effic
Sunace Australia

Sunace manufactures polymer additives for the construction industry. The Sunace plant in Brooklyn, western Melbourne, is a complex chemical production line. With a long term dedication to efficiency at the plant, Sunace have had a series o
Geelong Galvanizing

The project comprised of an assessment of the wind resource at the site to determine the feasibility of a wind turbine installation. Following this, a detailed Level 2 energy audit of the site's operations was conducted which included all
Developing Countries
Solar Minigrids in Pakistan

Enhar assisted Indus Earth Trust to design and develop Solar minigrids in four villages in Sindh, Pakistan. The villages are low income communities, three of which have never had access to grid power - this is commonplace in rural&n
Schools
Girton Grammar School

Enhar’s approach was to study both the fabric of the buildings and the behaviour of its occupants. Factors which were found to dictate the energy usage included: Lighting controls for Classrooms and common areas Sta
Brunswick Secondary College

This project assessed a High School in Brunswick Victoria built in 1915 which services 1,000 students. Enhar performed a walkthrough of the site and the problem classrooms to identify primary causes of poor thermal comfort and indoor environme
St Mary's Primary School

St Marys school is a primary with 200 students in Thornbury, Victoria. The primary outcome of the work was to guide St Mary’s in how to allocate funds from this program for energy efficiency and solar. Enhar conducted a full walk through
New South Wales
Waverley Council solar PV feasibility studies

Waverley Council appointed Enhar to deliver a feasibility report that outlines suitable Council owned rooftops for photovoltaic systems. Waverley Council wishes to offset the energy consumption of the new public Wi-Fi system to be rolled out c
Office of Environment and Heritage, Government of New South Wales

Enhar was commissioned by the NSW Office of environment and heritage, Department of Premier and Cabinet to develop a consumer guide to small wind turbine generation in NSW. This followed the success of the Victorian small wind consumer guide,
Warringah Council Wind Turbine Feasibility

Warringah Council comissioned Enhar to undertake a feasibility assessment of a wind turbine at their Aquatic Centre. Enhar analysed wind resource and energy yield from a 20kW wind turbine under considration. “Enhar were a pleasure
Energy Saver Scheme Efficiency Experts Panel

Enhar has been approved by the NSW Government as an energy auditor and technical support consultant on the respected Energy Saver Scheme. This means that our clients in New South Wales can enjoy a generous subsidy towards the cost of our energy au
Grant Approvals
Corex Plastics

Enhar was commissioned by a Corex Plastics to author and submit an application for the Clean Technology Grant. The sustainability measures included insulation of pipework, upgrading various electrical pumps at the site, installing variable speed d
Barfell Industries

Barfell manufacture over 90% of hose sold in Australia. Enhar was commissioned to assist prepare a Clean Technology Grant Application for the plant to replace an ageing air compressor and investigate other energy saving opportunities. Enhar co
SunAce Australia

SunAce is a leading polymer additive manufacturer in Australia. They produce an extensive range of PVC stabilisers and metallic stearates. SunAce has commissioned two major energy audits in 2009 and 2011 to investigate low cost and effective
Wind Power
Pacific Hydro

Enhar was commissioned by Pacific Hydro to produce photomontages of the Crowlands wind farm. The photomontages, produced by Enhar using specialist software and recent photos of the existing landscape, were displayed at a public consultation event.
Lidar wind resource monitoring for Local Council 6MW wind farm

Enhar was engaged by a Council in Western Australia to provide a technical feasibility study into a wind farm concept. Our feasibility report provided a wind speed estimate and recommended resource monitoring. Enhar subsequently work with our
Private Owner Study

The project comprised of an assessment of the wind resource at the site to determine the feasibility of a wind turbine installation. Following this, a detailed Level 2 energy audit of the site's operations was conducted which included all
Small Wind Energy
Vicroads

Enhar was commissioned to assist in the initial scoping and content of a renewable energy guideline for VicRoads Projects. The purpose of the guidelines is to provide project managers direction for incorporating renewable energy into VicRoads road
Mornington Peninsula Shire

Enhar was commissioned by Mornington Peninsula Shire to undertake a wind resource investigation in Mornington Peninsula Shire. This project involved installation of three anemometers and wind vanes at four locations around the Peninsula. Enhar pro
Sustainability Victoria

Enhar was commissioned by the Sustainability Victoria to develop a consumer guide to small wind turbine generation in Victoria. This guides an interested consumer through choices regarding technology, payback and suppliers of wind turbine. See