Core Complex
Core Complex 200kW Rooftop Solar
Solar PV
Port Melbourne 200kW rooftop solar with 14 x new NMI meters.
Key Achievements:
Impact
Project Scope
- Detail design for construction – SLD, interlock schematics, general arrangements, labels.
- Grid Application and Management – Citipower.
- Parts sourcing assistance.
- Installation troubleshooting and support of contractors.
Project Details
- 200kW PV system on a single roof shared by 10 tenants and 4 electrical connections.
- Grid protection relay interlock between 4 connection points to satisfy the distributor.
Project Challenges
- A good quality SLD was required to show all 14 of the new NMIs and the relationship to the solar.
- Client and installer subcontractor had limited experience with shared interlocks and relay programming.
- Enhar provided installation support and trouble shooting.