Akuo
Electrical design of 2 x 5MW batteries on Tonga
Battery Storage
Detailed electrical design of LV and MV components of BESS systems.
Key Achievements:
- Stabilising the frequency on Tonga Island grid.
 

Impact


Project Scope
- Review of Electrical Design against Australian Standards.
 - Earthing Design.
 - Cable tray and cable ladder design.
 - Overall electrical schematic.
 - Lock out tag out design.
 - Bill of Materials for earthing, cables, cable trays, cable ladders.
 
Project Details
- Tonga 1: 10MWh/5MW BESS project in Tonga.
 - Tonga 2: 17.4MWh/5MW BESS connected to a solar farm in Tonga.
 



Project Challenges
- Compliance with Australian Standards in a Pacific Island environment.
 - Long lead time in ordering and delivering components to remote island location.
 - Working across multiple timezones for client and project team.
 
Need advice on a project?